December 2024 Update
![AC17572D-1708-4457-BC97-CBBABF11E6F7](https://static.wixstatic.com/media/76ab83_9c5bef94b03348beb2a6ecbd649eaf56~mv2.jpeg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/76ab83_9c5bef94b03348beb2a6ecbd649eaf56~mv2.jpeg)
AC17572D-1708-4457-BC97-CBBABF11E6F7
![5FF838BA-8934-4D63-B64F-4C283E33CB9C](https://static.wixstatic.com/media/76ab83_abdc700096374fa2ac4321caf18685b6~mv2.jpeg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/76ab83_abdc700096374fa2ac4321caf18685b6~mv2.jpeg)
5FF838BA-8934-4D63-B64F-4C283E33CB9C
![9CE369BE-E204-44AB-8D72-CD1275C9CDC5](https://static.wixstatic.com/media/76ab83_6787c5d24e264d8cb9e8b73238fd3c37~mv2.jpeg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/76ab83_6787c5d24e264d8cb9e8b73238fd3c37~mv2.jpeg)
9CE369BE-E204-44AB-8D72-CD1275C9CDC5
![AC17572D-1708-4457-BC97-CBBABF11E6F7](https://static.wixstatic.com/media/76ab83_9c5bef94b03348beb2a6ecbd649eaf56~mv2.jpeg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/76ab83_9c5bef94b03348beb2a6ecbd649eaf56~mv2.jpeg)
AC17572D-1708-4457-BC97-CBBABF11E6F7
1/4
• SOFTBALL FIELD TURF INSTALLATION AND MASONRY WORK IS COMPLETE.
• PRACTICE PITCHING MOUND TURF INSTALLATION IS COMPLETE.
• BASEBALL FIELD GRAVEL AND TURF INSTALLATIONS ARE IN PROGRESS.
• CONCESSION STANDS UNDERGROUND PLUMBING WORK IS IN PROGRESS
• PRE-ENGINEERED METAL BUILDING STEEL ERECTION IS IN PROGRESS.
• ATHLETIC WALL WORK FOR BASEBALL AND SOFTBALL FIELDS ARE IN PROGRESS.